Before you buy a site or apply for financing, you need to know which process, which plant and which costs your project requires. We work it through from the input to the end product.
Operators · Municipal waste companies · Investors · Project developers
The expensive mistakes in a recycling plant are rarely made on the construction site. Most of them are already in the first cost estimate.
Machines and conveyors are sized by volume. If throughput is stated only in t/h and an average bulk density is assumed, the volume flow of a light mixture comes out far too small. Belts that are too narrow and bottlenecks then only show up in operation.
A cost estimate built on a single budget quotation inherits that supplier's scope. Conveyors, steelwork, electrics and controls, dust extraction and buildings are then underestimated or missing altogether.
Whether the line fits into the hall and the plot, with bunkers, platforms, maintenance access and escape routes, often only becomes clear in detailed design. By then the site and the budget are already fixed.
Four modules in a fixed sequence. Each builds on the one before, so every figure in the report can be traced back to its source.
The starting point is which fractions are to be produced, and in what quality.
The mass balance sets the size of every machine and the width of every belt. That is why it comes before the layout.
The layout shows whether the plant fits into the hall and the plot before a site is committed.
With process, mass balance and layout in place, the cost estimate rests on quantities and line items.
Documents you can put in front of your management, the financing bank, a funding body or the authority.
Block flow diagram, mass balance and 3D layout are produced by the same team. The cost estimate is built directly on these documents.
More than 20 years in sorting and recycling plant engineering, on the supplier side and on the operator side. We know what a machine delivers and what is missing from a quotation.
On request, the study is followed by the tender, the permit application and support up to the performance test, all built on the same documents.
We correspond in English or German.
Tell us briefly what you are planning. We reply within 24 hours.
Dipl.-Ing. Thomas Baldt will contact you personally within 24 hours.
For urgent matters you can reach us directly at
+43 664 73030310 – by phone or via WhatsApp –
or at office@experts4recycling.com
Scan the code with your phone camera or tap the button. A WhatsApp chat opens directly with Dipl.-Ing. Thomas Baldt, without a form and without waiting.
Open WhatsApp chat Or call: +43 664 73030310